Steve Brinich (stevemb) wrote,
Steve Brinich
stevemb

Furnace Installation

The furnace installation crew arrived more or less on schedule. The new furnace was delayed a few hours (though they spent about that much time disconnecting/disassembing/removing the old one anyway). All seems to be in order so far.

The new unit comes with an even more complicated thermostat. Theoretically, it could also control the humidifier, but the wiring bundle didn't have enough lines to support that function; so we'll have to make the arduous trek down the hallway and open the utility closet door all three or four times a year when it needs to be significantly adjusted.

It took a bit longer than expected, and <lj user=starmalachite> wasn't up to going out tonight, so we skipped our usual Three Left Feet meeting.
Subscribe

  • Back From OVFF

    starmalachite and I got home last night to four very needy cats. The two new arrivals took the first prolonged absence of their humans…

  • Headed For Conterpoint

    I'll be spending the rest of the morning checking that we have all the stuff we'll need for the con ready to go, and then we'll be headed out to…

  • Back From OVFF

    starmalachite and I are back from OVFF; we had a one-hour flight delay and some heavy traffic on the way home (kind of like the delays…

  • Post a new comment

    Error

    Anonymous comments are disabled in this journal

    default userpic

    Your reply will be screened

  • 0 comments